SC5832 Site Prep Guide

March 2008
21 pages

Overview of the process

  1. Review the system specifications.
  2. Ensure you have an appropriate space to put the system, or make appropriate changes to create the space.
  3. Verify you have adequate electrical power and cooling at the site. If not, upgrade your site as needed.
  4. Verify you can connect to existing networks. If not, extend your networks to the site.
  5. Verify that you can connect to all the user workstations that will require access to the SiCortex system.
  6. Verify you can connect to existing and planned external storage devices.
  7. Plan the actual delivery of the system.
  8. Plan the assembly, installation, and power-up of the system. SiCortex provides diagnostics that you run immediately after power-up, to ensure every component of the system is operating correctly.
  9. Plan your own testing of the system. Before loading your target applications, you may want to run your own diagnostic tests.
  10. Plan the deployment of your applications on the system.